| Project Description: |
HINSDALE- BRIDGE REPLACEMENT, H-16-003 (04X), OLD DALTON ROAD OVER EAST BRANCH HOUSATONIC RIVER
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Ryan P. Wilcox![]() |
| Estimated Total Contract Cost: | $8,037,900.00 |
| Estimated Total Federal Participating Construction Cost: | $8,335,600.00 |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||