| Project Description: |
FAIRHAVEN- BRIDGE PRESERVATION, F-01-002 (3PF), US 6 OVER ACUSHNET RIVER
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Albin Napit![]() |
| Estimated Total Contract Cost: | $14,000,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|