| Project Description: |
BARNSTABLE- CORRIDOR IMPROVEMENT ON ROUTE 28 (FALMOUTH ROAD) FROM CAPE COD MALL TO AIRPORT ROTARY (PHASE 1)
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Greg Frazier![]() |
| Estimated Total Contract Cost: | $21,606,000.00 |
| Estimated Total Federal Participating Construction Cost: | $22,631,310.00 |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||