| Project Description: |
TAUNTON- CONSTRUCTION OF A NEW DISTRICT 5 ADMINISTRATION BUILDING ON COUNTY STREET
The existing D5 Admin Bldg was constructed in the 1950s and no longer fits the district's needs. The electrical feed is at its maximum capacity and loses power when the district exceeds the capacity.
|
| Location: | |
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2028 |
| Project Manager: | Edmond Libsch![]() |
| Estimated Total Contract Cost: | $54,250,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|