| Project Description: |
ARLINGTON- BELMONT- LEXINGTON- LINCOLN- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 2
This project is for the replacement of guide and traffic signs on State Route 2 between Bedford Road (Tracey's Corner) in Lincoln and Alewife Brook Parkway in Arlington, including applicable signs on intersecting secondary roads.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Spring 2027 |
| Project Manager: | Stephen Timmins![]() |
| Estimated Total Contract Cost: | $1,536,025.50 |
| Estimated Total Federal Participating Construction Cost: | $1,663,245.00 |
| Funding Provision: | This project is planned to be funded through the 2027 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
| District: | District 4 |
| Current Status: | 100% Package Comments to DE (as of 10/06/2026 ) |
|
Bridges |
||||||
|
|
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||