Project Description:
ARLINGTON- BELMONT- LEXINGTON- LINCOLN- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 2
This project is for the replacement of guide and traffic signs on State Route 2 between Bedford Road (Tracey's Corner) in Lincoln and Alewife Brook Parkway in Arlington, including applicable signs on intersecting secondary roads.
Location:
  • Town of Arlington
  • Town of Belmont
  • Town of Lexington
  • Town of Lincoln
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Construction Begins: Spring 2027
    Project Manager: Stephen Timmins
    Estimated Total Contract Cost: $1,536,025.50
    Estimated Total Federal Participating Construction Cost: $1,663,245.00
    Funding Provision: This project is planned to be funded through the 2027 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 4
    Current Status: 100% Package Comments to DE (as of 10/06/2026 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2027
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: ARLINGTON
    BELMONT
    LEXINGTON
    LINCOLN
    Category: Advertised Projects Constr.
    Budget Section: 2A
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Hwy Safety Improvement Prgm (HSIP)
    Federal Cost: $2,187,864.00
    State Cost: $243,096.00
    Total Cost: $2,430,960.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 12/15/2025
    Project Initiation Form PIF Entered 12/15/2025
    Project Initiation Form PRC Submitted 12/15/2025
    Project Review Committee PRC Approved 03/10/2026
    Project Management
    100% Design 100% Package Received 05/18/2026
    100% Design 100% Package Comments to DE 10/06/2026
    75% Design 75% Package Received 05/18/2026
    Final Design PS&E Received 08/31/2026