| Project Description: |
SPRINGFIELD- CHICOPEE- PAVEMENT PRESERVATION ON I-291 (MM 0-5.2)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $5,610,576.20 |
| Estimated Total Federal Participating Construction Cost: | $5,782,658.25 |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||