DISTRICT 2- DISTRICT 3- VRU CROSSWALK INSTALLATION AT STATE SIGNALS AT MULTIPLE LOCATIONS
This project is part of a multi-year effort, and the FY27 projects follow a previous round of projects from FY26 (614241/614242/614243). Improvements will include some or all of the following: changes to traffic signal timing, phasing, coordination, detection, addition or reconstruction of curb ramps and crosswalks, providing Accessible Pedestrian Signals (APS) push buttons with countdown pedestrian signal heads, reconstruction of sidewalks connecting signalized intersections with bus stops, restricting right turns on red, and minor geometric changes. The FY27 projects include locations that may require ROW, Environmental permitting, more complex design considerations, or additional outreach to stakeholders and municipalities. This project involves upgrades at 4 locations for VRUs at or near MassDOT owned signals near bus stops in District 2 & 3. The first three locations are located in District 2 at the intersections of Russell St at the Hampshire Mall driveway, Hadley; East Main St (Route 20) at Delmont Ave, Westfield; and Springfield Rd (Route 20), Walmart to East Mountain Rd, Westfield. The third location is in District 3 at the intersection of Southbridge St (Route 12) at Oxford St North, Auburn.
Location:
Design Responsibility: Consultant
Right of Way Responsibility: MassDOT
Construction Begins: Winter 2027/2028
Project Manager: Jonathan E Freeman
Estimated Total Contract Cost: $2,545,039.04
Estimated Total Federal Participating Construction Cost: $2,674,234.14
Funding Provision: This project is planned to be funded through the 2027 Transportation Improvement Program for the STATEWIDE.
District: District 2
Current Status: Design Public Hearing (as of 11/19/2026 )

Contracts (0) Progress
No contracts associated with this project

Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2027
    Responsible MPO: STATEWIDE
    Location: District
    Districts: District 2
    District 3
    Category: Advertised Projects Constr.
    Budget Section: 2A
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Hwy Safety Improvement Prgm - Vulnerable User Safety / VUS
    Federal Cost: $2,939,240.70
    State Cost: $326,582.30
    Total Cost: $3,265,823.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 02/19/2026
    Project Initiation Form PIF Entered 02/19/2026
    Project Initiation Form PRC Submitted 02/19/2026
    Project Review Committee PRC Approved 03/03/2026
    Project Management
    25% Design 25% Package Received 06/01/2026
    25% Design Design Public Hearing 11/19/2026
    25% Design Design Public Hearing 11/19/2026
    75% Design 75% Package Received 06/01/2026
    75% Design 75% Package Comments to DE 07/13/2026
    75% Design 75% Package Comments to DE 07/14/2026