| Project Description: |
DISTRICT 4- VRU CROSSWALK INSTALLATION AT STATE SIGNALS AT MULTIPLE LOCATIONS
|
| Location: | |
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Autumn 2027 |
| Project Manager: | Jonathan E Freeman![]() |
| Estimated Total Contract Cost: | $1,680,088.91 |
| Estimated Total Federal Participating Construction Cost: | $1,777,246.76 |
| District: | District 4 |
| Current Status: | 75% Package Received (as of 06/05/2026 ) |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||||||||