| Project Description: |
DISTRICT 5- VRU CROSSWALK INSTALLATION AT STATE SIGNALS AT MULTIPLE LOCATIONS
|
| Location: | |
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Autumn 2027 |
| Project Manager: | Jonathan E Freeman![]() |
| Estimated Total Contract Cost: | $1,090,062.50 |
| Estimated Total Federal Participating Construction Cost: | $1,238,209.13 |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|