| Project Description: |
FRANKLIN- PAVEMENT PRESERVATION ON I-495 (MM 42.5-44.5)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $6,560,879.50 |
| Estimated Total Federal Participating Construction Cost: | $6,762,108.05 |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||