| Project Description: |
STURBRIDGE- SPENCER- PAVEMENT PRESERVATION ON SR49 (MM 0-7.43)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $11,160,765.00 |
| Estimated Total Federal Participating Construction Cost: | $11,503,076.78 |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||