| Project Description: |
PLYMOUTH- PAVEMENT PRESERVATION ON SR3A (MM 0.6-6.4)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $4,354,350.00 |
| Estimated Total Federal Participating Construction Cost: | $4,683,659.50 |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||