| Project Description: |
STERLING- WEST BOYLSTON- PAVEMENT PRESERVATION ON SR110 (MM 11.11-4.55)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $2,655,922.50 |
| Estimated Total Federal Participating Construction Cost: | $2,856,783.82 |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||