| Project Description: |
PITTSFIELD- PAVEMENT PRESERVATION ON US20 (MM 3.19-6.69)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $4,952,062.50 |
| Estimated Total Federal Participating Construction Cost: | $5,326,575.63 |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||