| Project Description: |
RUTLAND- HOLDEN- PAVEMENT PRESERVATION ON SR122A (MM 20.9-26.9)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $4,813,746.74 |
| Estimated Total Federal Participating Construction Cost: | $5,177,799.36 |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||