| Project Description: |
DRACUT- METHUEN- PAVEMENT PRESERVATION ON SR113 (MM 21.3-26.4)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $4,769,094.33 |
| Estimated Total Federal Participating Construction Cost: | $5,129,769.99 |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||