| Project Description: |
SPRINGFIELD- PAVEMENT PRESERVATION ON US5 (MM 4.2-7.9)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $7,038,281.26 |
| Estimated Total Federal Participating Construction Cost: | $7,254,152.35 |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||