| Project Description: |
WARREN- PAVEMENT PRESERVATION ON SR67 (MM 6.1-8.5)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $2,425,500.00 |
| Estimated Total Federal Participating Construction Cost: | $2,608,935.00 |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||