| Project Description: |
WARREN- WEST BROOKFIELD- PAVEMENT PRESERVATION ROUTE 19/ROUTE 67 (MM 14.3-16.5)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||