| Project Description: |
BLANFORD- PAVEMENT PRESERVATION ON SR23 (MM 27.7-33.3)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $4,511,430.00 |
| Estimated Total Federal Participating Construction Cost: | $4,852,619.10 |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||