| Project Description: |
REVERE- LYNN- PAVEMENT PRESERVATION ON SR107 (MM 1.5-3.9)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $5,894,542.50 |
| Estimated Total Federal Participating Construction Cost: | $6,075,333.99 |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||