| Project Description: |
UXBRIDGE- MILLVILLE- PAVEMENT PRESERVATION ON SR146 (MM 0-3.7)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $8,333,325.00 |
| Estimated Total Federal Participating Construction Cost: | $8,588,916.38 |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|