LEOMINSTER- CULVERT REPLACEMENT, CULVERT REPAIR AND RETAINING WALL REPLACEMENT AND RELATED WORK AT THREE LOCATIONS
The project locations are Pleasant Street, Union Street and Lancaster Street. At Pleasant Street, the project consists of replacing the temporary plastic pipe with box culvert. Additionally, this project will include the restoration of the channel downstream of the culvert, reconstructing the roadway and sidewalks, and related work. At Lancaster Street, the proposed work includes reconstruction of the retaining wall and sidewalk reconstruction. At Union Street, the proposed work involves stabilization of the slopes at each quadrant of the existing culvert.
Location:
  • City of Leominster
  • Construction Begins: Autumn 2026
    Resident Engineer: -- not assigned --
    Construction Bid Price: $4,048,823.20
    District: District 3

    Contracts (1) Progress
    # 136648 -- Construction Contract
    Culvert Replacement, Culvert Repair and Retaining Wall Replacement and Related Work at Three Locations

    Bridges

    Contract Dates
    Notice to Proceed: 11/06/2026
    Contract Information
    Project Designer: Consultant
    Funding Source: FED. AID. ACCELERATED BRIDGE
    See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/10/2026
    Project Initiation Form PIF Entered 03/10/2026
    Project Initiation Form PRC Submitted 03/10/2026
    Project Review Committee PRC Approved 03/19/2026
    Project Status Advertised 09/05/2026
    Project Management
    Final Design PS&E Received 06/01/2026
    Final Design PS&E Received - Resub 1 07/10/2026
    Final Design PS&E Received - Resub 2 07/30/2026