Project Description:
EGREMONT- SHEFFIELD- CULVERT REPLACEMENTS ON ROUTE 41 (DESIGN-BUILD)
This project proposes to replace two short-span bridges and three culverts on Route 41 in Sheffield and Egremont. None of these structures are eligible for bridge funding under current MassDOT programs. The five structures are all at advanced levels of deterioration. At the Egremont location, Route 41 was reduced to one-lane alternating traffic (with temp. signal) and the other four locations are in similar condition. No highway widening is proposed; all work is intended to occur within SHLO; new structures will meet stream-crossing standards. The three culverts are:1. Egremont Route 41 over un-named stream to Harman Marsh Pond (just north of Sheffield town-line); 2. Sheffield (S-10-022) Route 41 over tributary to Willard Brook (800-ft north of Berkshire School Rd); 3. Sheffield Route 41 over Bear Rock Brook (2,100-ft north of CT line). The two Short-Span Bridges are: 1. Sheffield (S-10-025) Route 41 over Race Brook (1,800-ft south of Salisbury Rd) and 2. Sheffield (S-10-026) Route 41 over Dry Brook (at intersection of Salisbury Rd).
Location:
  • Town of Egremont
  • Town of Sheffield
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Marco Pereira
    Estimated Total Contract Cost: $12,373,000.00
    Estimated Total Federal Participating Construction Cost: $12,876,119.00
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (1) Progress
    # 115750 -- Design -- Services
    Statewide - Master Service Agreement for design and review services. Final

    Bridges

    See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/13/2026
    Project Initiation Form PIF Entered 03/13/2026
    Project Initiation Form PRC Submitted 03/26/2026
    Project Review Committee PRC Approved 05/07/2026