| Project Description: |
NEWTON- SHARED USE PATH CONNECTION ALONG QUINOBEQUIN ROAD
This project is the construction of a shared use path and along a section of Quinobequin Road under MassDOT's jurisdiction. The intention is to provide consistent treatment along Quinobequin by developing a 10' shared use path with 3' buffer that connects to DCR's Charles River Greenway.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Janhavi Limaye![]() |
| Estimated Total Contract Cost: | $1,100,000.00 |
| Estimated Total Federal Participating Construction Cost: | $1,266,860.00 |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|