| Project Description: |
MEDWAY- CULVERT REPLACEMENT ON MILFORD STREET (ROUTE 109) AT TWO LOCATIONS
The proposed project will include new culverts with greater capacity and potentially some increase in the roadway profiles in the brook crossing areas to improve the water flow and prevent roadway flooding.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Lawrence Cash![]() |
| Estimated Total Contract Cost: | $3,956,030.00 |
| Estimated Total Federal Participating Construction Cost: | $4,410,427.10 |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||