| Project Description: |
DISTRICT 5- DRAWBRIDGE OPERATION, REPAIR AND SYSTEMATIC PRESERVATION AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD)
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Albin Napit![]() |
| Estimated Total Contract Cost: | $6,000,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||