| Project Description: |
DISTRICT 5- HIGHWAY SWEEPING AT VARIOUS LOCATIONS
Work under this contract consists of sweeping, and cleaning roadways state highways, by removing
and disposing of sand, leaves, weeds, brush, trees, refuse and other debris which has accumulated
within the layout of various state highways as assigned in District 5, in full compliance with the
MassDEP Policy No. BAW-18-001: Reuse and Disposal of Street Sweepings.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Terence Roche![]() |
| Estimated Total Contract Cost: | $1,700,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|