| Project Description: |
DISTRICT 5- SCHEDULED AND EMERGENCY GUARDRAIL AND CABLE BARRIER REPAIRS AT VARIOUS LOCATIONS
The work to be done under this contract consists of the repair and replacement of existing guardrail
guardrail end treatments, and cable barrier as directed, along various State Highways in District 5.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Terence Roche![]() |
| Estimated Total Contract Cost: | $2,500,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||