| Project Description: |
DISTRICT 5- SCHEDULED AND EMERGENCY FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS
The work under this Contract consists of furnishing the labor, materials, transportation and
equipment necessary to fabricate and install or replace overhead and ground-mounted guide
signs, warning, regulatory, route markers, sign supports and other related work on various
roadways throughout the District as required during the contract period.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Terence Roche![]() |
| Estimated Total Contract Cost: | $800,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|