| Project Description: |
DISTRICT 5- TRAFFIC SIGNAL MASTER CONTROL AND CABINET ASSEMBLY INSTALLATION AT VARIOUS LOCATIONS
The intent of this Contract is to furnish, repair, and install complete traffic signal control cabinet
assemblies and foundations at various locations.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Terence Roche![]() |
| Estimated Total Contract Cost: | $2,250,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||