| Project Description: |
DISTRICT 5- SCHEDULED AND EMERGENCY DRAINAGE AND EROSION REPAIRS AT VARIOUS LOCATIONS
The work to be done under this contract consists of drainage related repairs performed on
drainage systems under the control of District 5
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Terence Roche![]() |
| Estimated Total Contract Cost: | $1,924,773.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||