| Project Description: |
HOLDEN- BYCYCLE AND PEDESTRIAN IMPROVEMENTS AND RECONSTRUCTION OF WACHUSETT STREET
The purpose of this project is to perform a full depth reclamation of the roadway, and reshape the crown to decrease ponding. The project will also result in a reconfigured intersection at Wachusett and Highland Road. A shared-use path will connect Fort Sumter Drive and the surrounding neighborhoods with a safe access point to the Rail Trail off Mill Street.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Douglas Johnson![]() |
| Estimated Total Contract Cost: | $8,100,000.00 |
| Estimated Total Federal Participating Construction Cost: | $8,400,000.00 |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||