| Project Description: |
CHESTER- COLRAIN- CONWAY- CLEANING AND PAINTING OF 3 BRIDGES: C-11-013 (03P), C-18-001 (0GR), C-20-014 (AY3)
This project will consist of Structural Cleaning & Painting at three bridges in District 1. The bridge locations are the Maple Street bridge over the West branch of the Westfield River (Chester), the Franklin Hill Road bridge over the East branch of the North River (Colrain), and the Reeds Bridge Road bridge over the South River (Conway).
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Peter Soja![]() |
| Estimated Total Contract Cost: | $1,396,551.73 |
| Estimated Total Federal Participating Construction Cost: | $1,500,000.00 |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||