| Project Description: |
BECKET- HUNTINGTON- LENOX- MONTGOMERY- WORTHINGTON- BRIDGE PRESERVATION OF 11 BRIDGES
This project will consist of Bridge Preservation work in the form of in-kind deck repairs, painting, steel repairs, substructure patching, and/or coating. This work will be done at eleven bridge locations in Becket, Huntington, Lenox, Montgomery, and Worthington.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Genesis PozDiaz![]() |
| Estimated Total Contract Cost: | $5,580,527.59 |
| Estimated Total Federal Participating Construction Cost: | $5,993,900.00 |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|