| Project Description: |
EGREMONT- GREAT BARRINGTON- NEW MARLBOROUGH- SHEFFIELD- TYRINGHAM- BRIDGE PRESERVATION OF 7 BRIDGES
This project will consist of Bridge Preservation work in the form of in-kind deck repairs, painting, steel repairs, concrete beam end repairs, and substructure patching. This work will be done at seven bridge locations in Egremont, Great Barrington, New Marlborough, Sheffield, and Tyringham.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Genesis PozDiaz![]() |
| Estimated Total Contract Cost: | $5,260,344.82 |
| Estimated Total Federal Participating Construction Cost: | $5,649,999.99 |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||