| Project Description: |
WEST STOCKBRIDGE TO BOSTON- INSTALLATION OF ENHANCED REFERENCE MARKERS ON I-90/MASSACHUSETTS TURNPIKE
This project is for the replacement of enhanced reference markers along Interstate 90 (Massachusetts Turnpike) between West Stockbridge and Boston.
|
| Location: | |
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Stephen Timmins![]() |
| Estimated Total Contract Cost: | $540,503.13 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||