| Project Description: |
DISTRICT 3- DEPLOYMENT OF TEMPORARY TRAFFIC CONTROLS AT VARIOUS LOCATIONS
Work under this contract will consist of furnishing, deploying, maintaining, and removing traffic control devices on various state highways as directed by the Engineer. The work will consist of scheduled work and emergency work in support of maintenance operations.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2027 |
| Project Manager: | Ranjit Sivasubramaniam![]() |
| Estimated Total Contract Cost: | $500,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||