| Project Description: |
WORCESTER- STRUCTURAL STEEL CLEANING, PAINTING AND VARIOUS REPAIRS OF W-44-095 (1TC & 1TD) I-290 OVER LINCOLN STREET
The scope of work for this project shall include the cleaning and painting of structural steel, repair of steel beam ends, and the execution of all other repairs and maintenance activities required to maintain the structures in a safe and serviceable condition, as identified and directed by the Engineer.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Genesis PozDiaz![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||