| Project Description: |
WESTFORD- BRIDGE PRESERVATION, W-26-021 (27W, 27X), I-495 (NB/SB) OVER TADMUCK ROAD
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Autumn 2027 |
| Project Manager: | Genesis PozDiaz![]() |
| Estimated Total Contract Cost: | $2,588,949.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||