| Project Description: |
WESTFORD- BRIDGE PRESERVATION, W-26-021 (27W, 27X), I-495 (NB/SB) OVER TADMUCK ROAD
The work shall include cleaning, painting, and repairing structural steel members, including repairs to bridge structural components damaged by truck impacts, and any other repairs deemed necessary or directed by the Engineer.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Autumn 2027 |
| Project Manager: | Genesis PozDiaz![]() |
| Estimated Total Contract Cost: | $2,588,949.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||