| Project Description: |
BOSTON- BRIDGE MAINTENANCE OF 2 BRIDGES: B-16-050 (4T6) AND B-16-051 (4T5)
This project will provide maintenance to bridges B-16-050 (4T6) AND B-16-051 (4T5)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Spring 2027 |
| Project Manager: | Alina Daragan![]() |
| Estimated Total Contract Cost: | $4,600,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|