BOSTON- BRIDGE MAINTENANCE OF 2 BRIDGES: B-16-050 (4T6) AND B-16-051 (4T5)
The purpose of this project is to repair the existing substructure, deck, and joints of the bridge carrying Boylston Street over the MBTA/I-90 and possibly the substructure of the bridge carrying Mass Ave over the MBTA/I-90. The substructure repairs for both bridges will be limited to the areas requiring railroad access. For substructure repairs, the track closest to the pier unit being repaired will have a nightly closure with trains diverted to the open track during working hours and reopened at the end of shift. For the deck and joint repairs, on-street parking shall be closed and nightly temporary lane closures shall take place as necessary. The tracks and travel lanes below the deck and joint repair areas will be closed during repair. Noise control and monitoring will be required. Coordination with nearby projects will take place for any possible traffic set ups.
Location:
  • City of Boston
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Construction Begins: Summer 2027
    Project Manager: Alina Daragan
    Estimated Total Contract Cost: $4,600,000.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 6
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 06/30/2026
    Project Initiation Form PIF Entered 06/30/2026
    Project Initiation Form PRC Submitted 06/30/2026
    Project Review Committee PRC Approved 07/13/2026
    Project Management