| Project Description: |
DISTRICT 3- SCHEDULED & EMERGENCY BRIDGE STRUCTURAL & SUBSTRUCTURE REPAIRS AND RELATED WORK AT VARIOUS LOCATIONS ALONG I-90
The work will consist of scheduled and emergency bridge structural and substructure repairs, as well as related work, at various locations along I-90 within District 3.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2027 |
| Project Manager: | Peter Soja![]() |
| Estimated Total Contract Cost: | $1,700,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||