| Project Description: |
UXBRIDGE- BRIDGE PRESERVATION, U-02-016 (1LR), ROUTE 16 (MENDON STREET) OVER THE WEST RIVER
The work will consist of wearing surface replacement, sidewalk reconstruction, bridge rail and transition replacement, and related bridge preservation work on Bridge No. U-02-016 (1LR), carrying Route 16 (Mendon Street) over the West River in Uxbridge.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Spring 2027 |
| Project Manager: | Genesis PozDiaz![]() |
| Estimated Total Contract Cost: | $1,300,002.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||