| Project Description: |
LOWELL- BRIDGE MAINTENANCE AND PRESERVATION, L-15-093 (2C5), FRENCH STREET OVER MERRIMACK CANAL
This project will consist of various types of Bridge Preservation work at the French Street bridge over the Merrimack Canal, in the municipality of Lowell.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Construction Begins: | Autumn 2027 |
| Project Manager: | Dylan Brown![]() |
| Estimated Total Contract Cost: | $1,607,200.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|