| Project Description: |
BOSTON- BRIDGE RECONSTRUCTION, B-16-462 (4EK) AND B-16-457 (4EE), STORROW DRIVE WESTBOUND OVER STORROW DRIVE EASTBOUND
This project will rehabilitate the tunnel serving Storrow Drive eastbound and westbound by addressing the substandard roadway configuration, fixing structural deficiencies and flooding, and improving accessibility and connectivity across Storrow Drive to the Esplanade for pedestrians and cyclists.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Alwin Ramirez![]() |
| Estimated Total Contract Cost: | $800,800,000.00 |
| Estimated Total Federal Participating Construction Cost: | $828,750,000.00 |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||