| Project Description: |
HOLDEN- SUPERSTRUCTURE REPLACEMENT, H-18-002 (223), STATE ROUTE 31 (RESERVOIR STREET) OVER PWRR
This project will replace the superstructure of the bridge carrying State Route 31/Reservoir Street bridge over the PW Railroad, in the Town of Holden.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Robert N Rottenbucher![]() |
| Estimated Total Contract Cost: | $10,091,296.55 |
| Estimated Total Federal Participating Construction Cost: | $10,465,048.27 |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||