| Project Description: |
BRAINTREE- BRIDGE REPLACEMENT, B-21-014 & B-21-016, PLAIN STREET AND STATE ROUTE 37 (WASHINGTON STREET) OVER MONATIQUOT RIVER (DESIGN ONLY)
This project will replace the bridges carrying Plain Street and State Route 37/Washington Street bridge over the Monatiquot River, in the City of Braintree.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Robert N Rottenbucher![]() |
| Estimated Total Contract Cost: | $28,686,289.59 |
| Estimated Total Federal Participating Construction Cost: | $29,748,744.76 |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|