| Project Description: |
CLARKSBURG- BRIDGE SUPERSTRUCTURE REPLACEMENT, C-15-001 (0C4), STATE ROUTE 8 (RIVER ROAD) OVER NORTH BRANCH OF THE HOOSIC RIVER
This project will replace the bridge carrying State Route 8/River Road over the North branch of the Hoosic River, in the town of Clarksburg.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Robert N Rottenbucher![]() |
| Estimated Total Contract Cost: | $19,547,813.70 |
| Estimated Total Federal Participating Construction Cost: | $20,271,806.80 |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|