| Project Description: |
WORCESTER- NEW MAINTENANCE DEPOT FOR AREA 3D
Work will consist of constructing a new Depot to serve as the main location for the Maintenance Area 3D located at 1130 Millbury Street in Worcester.
|
| Location: | |
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Kevin Robenhymer![]() |
| Estimated Total Contract Cost: | $5,750,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||