| Project Description: |
REVERE- BRIDGE REPLACEMENT, BR# R-05-004 ROUTE 1A (BEACH STREET) OVER THE MBTA AND B & M RAILROAD
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Other |
| Project Manager: | Gautam Sen![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 11/18/2000 ) |
|
Bridges
|
||||||
|
|
|
||||||||||||||